麻豆人妻一区二区三区,久久热这里只有精品6,日韩一级毛一片欧美一级57,日本电影一区二区之区在线播放

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.davylee.cn/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

在加工棚拆除前須進行技術(shù)交底!

來源:http://m.davylee.cn/   發(fā)布時間:2023-02-20

在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保護建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導(dǎo)致生銹。 木工加工棚搭設(shè)完畢后,須經(jīng)過專職員驗收合格,方可投入使用。在加工棚搭設(shè)和拆除前,須進行技術(shù)交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高處作業(yè)人員須經(jīng)過技術(shù)培訓(xùn)及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術(shù)規(guī)范及有關(guān)標(biāo)準(zhǔn)要求。搭設(shè)和拆除水平木工加工棚時,操作工人的“三寶”須齊備,且應(yīng)正確使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
木工加工棚
在木工加工棚搭拆時,應(yīng)避免上下同時作業(yè),把操作時間錯開。搭拆木工加工棚時,所有材料、工具應(yīng)堆放在建筑物外邊線以內(nèi)少2m,堆碼高度不超過1m。拆除的材料須傳遞到樓層內(nèi)并及時運走,嚴(yán)禁高空拋擲。搭拆木工加工棚時,應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)護。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆時,要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對危險情況要積極采取有效防護措施,確保人員。雨天、大風(fēng)天氣,暫停木工加工棚搭拆施工,并應(yīng)檢查維護木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。您有需求就來我們網(wǎng)站http://m.davylee.cn咨詢吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://m.davylee.cn Ask!

精品久久久久久红码专区| 亚洲精品伦理一区二区三区青春| 最新99精品视频在线观看| 久久精品水蜜挑AV综合天堂| 欧美日韩精品一区丁香| 亚洲视频专区一区二区| 国产精品久久久久九九九九不卡| 日韩欧美一级视频观看| 操久久久久久久久久久久久久久久久| 婷婷激情网五月天亚洲| 动漫无码AV在线免费观看| 久久久久蜜桃成人精品一区| 亚洲区一区二区三区视频| 久久久1区2区3区| 亚洲欧美日韩在线三区| 亚洲av成人精品日韩一区麻豆| 中文字幕最新在线资源| 亚洲国产精品成人一区二区三区| 日韩精品视频在线观看一区二区三区| 日韩精品中文字幕欧美| 久久国产亚洲一区二区三区| 2021国产三级精品三级在专区| 日韩专区精品无码资源首页| 国产一区二区综合资源| 亚洲国产精品成人综合色在线| 了解最新国产精品18久久| 亚洲AV无码之日韩精品| 午夜精品久久久久久99| 欧美日韩一区二区乱码| 日韩精品高清在线观看| 中文字幕最新在线资源| 欧美日韩精品免费一级| 人妻互换免费中文字幕| 欧美国产日韩在线播放| 久久综合视频中文字幕| 久久99亚洲精品视频| 欧美乱码精品一区二区三区卡| 欧美精品97在线观看| 亚洲成人免费久久av| 国产性生活视频免费| 一区二区久久久久久久久|