麻豆人妻一区二区三区,久久热这里只有精品6,日韩一级毛一片欧美一级57,日本电影一区二区之区在线播放

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.davylee.cn/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

通道及施工電梯防護(hù)棚要求要求

來(lái)源:http://m.davylee.cn/   發(fā)布時(shí)間:2021-11-18

1塔吊半徑以內(nèi)所有后臺(tái)制作加工、攪拌區(qū)必須搭設(shè)雙層防護(hù)棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場(chǎng)所掛設(shè)的標(biāo)志牌有:機(jī)械驗(yàn)收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進(jìn)行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開關(guān)箱與機(jī)械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護(hù)棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護(hù) 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語(yǔ)。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語(yǔ)字高為400mm,長(zhǎng)度根據(jù)尺寸現(xiàn)場(chǎng)均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場(chǎng)地質(zhì)情況做地基處理,處理方法可采用夯實(shí)、換填石 料等,必須保證其密實(shí)度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場(chǎng)場(chǎng)地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場(chǎng)技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無(wú)特殊說(shuō)明的,均作滿焊處理 ,現(xiàn)場(chǎng)安裝前應(yīng)對(duì)各 構(gòu)件焊接質(zhì)量進(jìn)行驗(yàn)收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機(jī)具應(yīng)獨(dú)立配置開關(guān)箱,開關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺(tái)風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

色婷婷是五月综合色| 人碰人碰人人97免费搜播| 国产微拍无码精品一区| 日韩亚洲中文字幕一区| 国产日韩欧美精品小视频| 操久久久久久久久久久久久久久久久| 亚洲一道本中文字幕一区二区| 亚洲欧美成在线观看| 亚洲国产精品成人一区二区三区| 97精品国产综合久久久免费| 亚州在线中文字幕经典a| 97精品国产综合久久久免费| 欧美日韩在线看免费看成人| 欧美国产日韩在线播放| 欧美色欧美亚洲另类在线视频| 有码无码人妻一区二区| 9久久99久久久免费精品然| 色欲香天天综合免费区一区二| 欧美日韩国产成人精品自拍视频| 亚洲欧美另类久久久精品| 国产无遮挡又污又黄又爽| 韩国三级电影视频网站| 日韩精品一区二区三区四区| 亚洲一区精品中文字幕| 丰满少妇爽视频一区二区三区| 亚洲中文字幕无码一区| 无码人妻w在线视频影院| 免费看亚洲精品大片| 国产v片在线免费观看| 2021久久国自产拍精品| 国产一区二区三区欧美日| 日韩欧美中文字幕一区二区| 97久久人人超碰国产精品| 欧美成人伦理在线播放| 四虎成人精品一区二区| 久久熟女av一区二区三区| 国产精品久久久久国产三| 国产精品23一区二区| 91蜜臀精品一区二区三区| 久久99热精品影院| 2021久久国自产拍精品|