工地防護欄的安裝要注意什么?

來源:http://m.davylee.cn/   發(fā)布時間:2022-02-10

設備前要測量管線、地上處理(是置換或許夯實的情況)、基坑邊坡、開挖、立柱暫時固定的方位、防護欄桿怎樣設備、澆注混凝土基礎、基坑圍欄緊固、調整。測繪:依據(jù)圖紙規(guī)劃要求和實踐地勢、方針進行施工布置圖,設置立柱中心線,按規(guī)矩的斜度、線形設備護欄網。

Before the equipment, first measure the pipeline, ground treatment (in the case of replacement or compaction), foundation pit slope, excavation, the orientation of temporary fixing of columns, protective railing, pouring concrete foundation, fastening and adjustment of foundation pit fence. Surveying and mapping: carry out the construction layout according to the drawing planning requirements and practical terrain and guidelines, set the column center line, and set the equipment guardrail according to the regular slope and alignment.
原始地基處理是確保護欄和整體穩(wěn)定性的重要條件,為確保立柱的穩(wěn)定性,需求替換和加固地基下的軟層。柱設備部分,從縱剖面上看,柱軸線呈直線,不應呈現(xiàn)不均勻現(xiàn)象;從高處看,柱頂光滑,不應呈現(xiàn)不平的情況,特別地勢在外?;鶞屎桶拙€是在調查和啟航的基礎上建立的。本來的地上被填滿了,斜坡又被夯實了。
The original foundation treatment is an important condition to ensure the stability of the guardrail and the whole. In order to ensure the stability of the column, it is necessary to replace and strengthen the soft layer under the foundation. For the column equipment, from the longitudinal section, the column axis is straight and should not be uneven; From a high point of view, the top of the column is smooth and should not be uneven, especially the terrain is outside. The benchmark and white line are established on the basis of investigation and sailing. The original ground was filled and the slope was tamped again.
臨邊護欄
基坑開挖時設備放樣方位,以確?;拥木藜殹T诨恿⒅O備進程中,有必要確保柱的穩(wěn)定性和與地基的緊密連接。在立柱設備進程中,選用小線段對立柱設備的直線進行測驗,并對部分進行調整,確保直線段,曲線段滑潤,立柱契合規(guī)劃圖紙要求。網格有必要與柱緊密連接,網面光滑平整,無明顯的翹曲和突起。設備護欄后,應設備立柱,以確保設備的正確性和健壯性。
During the excavation of foundation pit, the setting out orientation of equipment shall be ensured to ensure the size of foundation pit. In the process of foundation pit column equipment, it is necessary to ensure the stability of the column and the close connection with the foundation. In the process of column equipment, select small segments to test the straight line of column equipment, and adjust some parts to ensure that the straight line and curve segments are smooth, and the column meets the requirements of planning drawings. It is necessary for the grid to be closely connected with the column, and the grid surface is smooth and flat without obvious warpage and protrusion. After the equipment guardrail, the equipment column shall be installed to ensure the correctness and robustness of the equipment.
基坑護欄只要精確健壯的設備后才能夠有用維護施工,所以設備前要做的準備工作也是尤為重要的,決不可粗心,詳細的設備進程要看施工現(xiàn)場的實踐情況來做抉擇。
The foundation pit guardrail can effectively maintain the construction safety only after accurate and robust equipment, so the preparation work before the equipment is also particularly important, and must not be careless. The detailed equipment process depends on the practice of the construction site.

日本欧美一区二区免费不卡| 日本动漫精品v毛片大全| 日本精品福利在线视频| 国产一级二级三级精品| 亚洲欧美国产其他二区| 久久精品国产成人午夜福利| 欧美日韩永久精品一区二区| 国产三级久久久久久久久久| 精品视频亚洲一区二区三区| 经典国产乱子伦精品| 亚洲国产午夜精品不卡| 国产欧美精品区一区二区三区竹菊| 亚洲国产成人久久精品不卡| 久久精品水蜜挑AV综合天堂| 亚洲精品日韩在线丰满| 精品视频一区二区三区美女视频| 超碰人人在线免费观看| 国产一级r片内射老熟女| 九色九九综合久久爱| 国产精品23一区二区| 亚洲岛国av一区二区| 欧美日本aⅴ一区二区三区| 国产三级网络视频在线观看| 久久精品国产成人午夜福利| 国产精品日韩主播无套| 蜜臀99久久精品久久久| 亚洲欧美在线观看视频| 欧美一级精品片在线看| 久久久久久女人精品毛片| 国产欧美精品区一区二区三区竹菊| 青青草原精品国产亚洲av| 日本不卡久久伊人麻豆传媒| 婷婷激情亚洲综合综合久久| 一级国产一级日韩一级欧美| 久久久久国产精品熟女蜜臀| 久久久久成人精品免费播放寂寞少妇| 亚洲国产日韩一区精品| 日韩亚洲欧美综合在线| 欧美午夜激情久久久久| 国产一区二区三区网址| 四虎成人精品一区二区|